Thursday, 26 November 2015

CONSTRUCTION:CALL SHEETS

These stills and video was filmed on our school grounds on the rugby pitches and top of the hill which over looks the pitches. These shots were taken on the 26th of November in the afternoon, we chose to do it at this time as the pitches were not occupied so we could film uninterrupted for the afternoon.

1 comment:

  1. Good so far but normally the date, time and location are stated.

    ReplyDelete